Sign In
  • ENGLISH
  • HINDI
  • KANNADA
  • Home
  • World
  • Business
    • Check out more:
    • Fashion
    • Travel
    • Business
    • National News
    • World
  • News Room
    • Health
  • CHANNEL
  • Our Team
  • Aryavarth Awards
  • Honorary Doctorate​
  • About CMD
Reading: First Mountain Tunnel Breakthrough Achieved on Mumbai–Ahmedabad Bullet Train Corridor
Share
  • Breaking news
  • Politics
  • Business
  • World
  • Crime & Law
  • Technology
  • Arts & Culture
  • Fashion
  • Finance
  • Health
Reading: First Mountain Tunnel Breakthrough Achieved on Mumbai–Ahmedabad Bullet Train Corridor
Share
Friday, Jan 2, 2026
Facebook Twitter Youtube

Home        Word      Business        News Room

  • World
  • Travel
  • Opinion
  • Science
  • Technology
  • Fashion
Search
  • Home
  • World
  • Business
  • News Room
    • Health
  • CHANNEL
  • Our Team
  • Aryavarth Awards
  • Honorary Doctorate​
  • About CMD
Sign In
  • ENGLISH
  • HINDI
  • KANNADA
  • Home
  • World
  • Business
    • Check out more:
    • Fashion
    • Travel
    • Business
    • National News
    • World
  • News Room
    • Health
  • CHANNEL
  • Our Team
  • Aryavarth Awards
  • Honorary Doctorate​
  • About CMD
Reading: First Mountain Tunnel Breakthrough Achieved on Mumbai–Ahmedabad Bullet Train Corridor
Share
  • Breaking news
  • Politics
  • Business
  • World
  • Crime & Law
  • Technology
  • Arts & Culture
  • Fashion
  • Finance
  • Health
Reading: First Mountain Tunnel Breakthrough Achieved on Mumbai–Ahmedabad Bullet Train Corridor
Share
Friday, Jan 2, 2026
Facebook Twitter Youtube
Have an existing account? Sign In
Follow US
© 2024Aryavarthnew. All Rights Reserved.
THE ARYAVARTH EXPRESS - YOUR OWN ENGLISH DAILY NEWS PORTAL > India > Delhi (National Capital Territory of Delhi) > First Mountain Tunnel Breakthrough Achieved on Mumbai–Ahmedabad Bullet Train Corridor
Breaking newsDelhi (National Capital Territory of Delhi)India

First Mountain Tunnel Breakthrough Achieved on Mumbai–Ahmedabad Bullet Train Corridor

Sponsored by
Goenka Florist
3 Min Read
blank
First Mountain Tunnel Breakthrough Achieved on Mumbai–Ahmedabad Bullet Train Corridor
SHARE
Sponsored by
Goenka Florist
Review Overview

The Aryavarth Express

New Delhi: India’s first high-speed rail project marked a major milestone with the successful breakthrough of a mountain tunnel in Maharashtra’s Palghar district. Union Minister for Railways Ashwini Vaishnaw announced on Friday that Mountain Tunnel-5 (MT-5) has been completed, making it the first mountain tunnel breakthrough on the Mumbai–Ahmedabad Bullet Train corridor.

Addressing a press conference, the minister said the project includes seven mountain tunnels and one undersea tunnel. Of the total 508-kilometre corridor, tunnels account for 27.4 kilometres—21 kilometres underground and 6.4 kilometres as surface tunnels. Maharashtra has seven mountain tunnels with a combined length of 6.05 kilometres, while Gujarat has one mountain tunnel measuring 350 metres.

The recently completed MT-5 tunnel in Palghar district is 1.48 kilometres long (1.39 kilometres excluding portals and hood) and is the longest among the seven mountain tunnels planned in the project. Earlier, the first underground tunnel of nearly 5 kilometres between Thane and Bandra Kurla Complex (BKC) was completed in September 2025.

Providing further updates, Vaishnaw said the bullet train project will have 12 stations, with Sabarmati as the terminal in Gujarat and BKC as the Mumbai terminal. Three depots are also being constructed, instead of the usual two for a corridor of this length. He noted that delays in approvals during a previous state government tenure in Maharashtra led to the need for additional infrastructure planning.

Last month, another key achievement was recorded with the successful launch of a 130-metre span of a 230-metre-long steel bridge over National Highway-64 and the Bharuch–Dahej freight rail line near Kanthariya village in Gujarat’s Bharuch district. The continuous steel bridge consists of two spans of 130 metres and 100 metres, stands about 18 metres high, and weighs nearly 2,780 metric tonnes. Fabricated in Bhuj, the bridge is designed for a lifespan of 100 years.

The bridge was assembled using over 1.22 lakh high-strength bolts and launched within 12 hours using semi-automatic jacks, with carefully planned traffic blocks and diversions to ensure safety and minimize disruption.

Today's Newspaper 02-01-2026 #newspapers pic.twitter.com/5jFqbAr9as

— The Aryavarth Express (@AryavarthThe) January 2, 2026

The Mumbai–Ahmedabad High-Speed Rail Corridor stretches across 352 kilometres in Gujarat and Dadra and Nagar Haveli and 156 kilometres in Maharashtra, connecting major cities such as Ahmedabad, Vadodara, Surat, Vapi, Thane, and Mumbai. About 85 per cent of the route runs on viaducts, with 326 kilometres of viaduct construction already completed. Of the 25 planned river bridges, 17 have been finished so far.

Once operational, the bullet train is expected to reduce travel time between Mumbai and Ahmedabad to nearly two hours, significantly transforming inter-city travel and boosting business, tourism, and economic development along the corridor.

Review Overview
Subscribe to Our Newsletter
Subscribe to our newsletter to get our newest articles instantly!
TAGGED:Bullet TrainIndian RailwayMountain TunnelMumbai-AhmedabadNew Delhi
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Telegram Email Copy Link Print
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Assam CM Launches Financial Assistance Scheme for Udasin Bhakats
Next Article “Gross Misuse”: RS MP Priyanka Chaturvedi Flags AI Abuse on Social Media, Writes to IT Minister
Leave a review

Leave a Review Click here to cancel reply.

Recipe Rating




Please select a rating!

PM Modi to Inaugurate International Exposition of Sacred Piprahwa Relics on January 3

The Aryavarth ExpressNew Delhi : Prime Minister Narendra Modi will inaugurate the Grand International Exposition of Sacred Piprahwa Relics related…

Sponsored by
Goenka Florist

“Seriously Considering Reporting This to Cyber Police”: Javed Akhtar Slams AI-Generated Fake Video

The Aryavarth ExpressMumbai: Veteran lyricist and writer Javed Akhtar has strongly condemned an AI-generated fake video circulating on social media,…

Sponsored by
Goenka Florist

From EV Debuts to SUV Upgrades, Automakers Line Up Major Launches for Early 2026

The Aryavarth ExpressNew Delhi: India’s automobile industry is gearing up for a busy start to 2026, with several leading manufacturers…

Sponsored by
Goenka Florist

You Might Also Like

Sanjay Raut Slams Trump Over Kashmir Mediation Offer: “Who Made Him the Sarpanch?”

The Aryavarth ExpressMumbai: Shiv Sena (UBT) leader Sanjay Raut on Monday sharply criticized former US President Donald Trump for offering…

Eagles unbound Adventure park Bangalore

Mumbai Man Booked for Intentionally Setting Dog on Minor Boy

The Aryavarth ExpressMumbai: In a shocking incident that has sparked widespread outrage, a man in Mumbai has been booked for…

samachar parivartan

Language Row in Maharashtra: Supriya Sule Slams CM Fadnavis for Prioritising Hindi Over Marathi

The Aryavarth ExpressMumbai: The ongoing language debate in Maharashtra intensified as NCP-SCP MP Supriya Sule raised strong concerns over Chief…

samachar parivartan

“Very Serious Glitch”: Aviation Expert Harsh Wardhan on Global Airbus A320 Software Issue

The Aryavarth ExpressNew Delhi: Aviation expert Harsh Wardhan has described the recently detected Airbus software glitch as a “very serious”…

Goenka Florist

News

  • Breaking news
  • Business
  • Crime & Law
  • Opinion
  • World

PRASHANT GOENKA GROUP

  • The Aryavarth Express
  • Samachar Parivartan
  • Parivartan Prabha
  • Aryavarth Awards

SOCIAL

Facebook Twitter Youtube Instagram

Subscribe

  • Subscription

© THE ARYAVARTH EXPRESS 2020 – 2025.  Design by  WORLD DESIGNER SOCIETY

Join Us!
Subscribe to our newsletter and never miss our latest news, podcasts etc.
Zero spam, Unsubscribe at any time.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?